name: furkastrasse-fps-autoprotocol
description: "Furkastrasse-FPS-AutoProtocol: Fachplanersitzungen für Projekt 410.2725.10 Schaffhausen – WÜB Furkastrasse gemäss etablierter ERNE-Protokollgliederung aus Vorprotokollen erstellen und archivieren."
version: 1.0.0
author: Hermes Agent
license: MIT
metadata:
  hermes:
    tags: [furkastrasse, fps, fachplanersitzung, erne, autoprotocol, project-specific, protocol, transcript]
---

# Furkastrasse-FPS-AutoProtocol

Use this skill whenever the user sends or references a **Fachplanersitzung / FPS / Fachplaner-Jourfix** for project **410.2725.10 – Schaffhausen – WÜB Furkastrasse**.

This project is **not** to be forced into the generic FPS structure. Furkastrasse is already in an established running protocol series; future FPS protocols must follow the **existing Furkastrasse protocol structure from prior protocols**, especially the archived **Protokoll 28. Fachplanersitzung vom 10.06.2026**.

## Always load alongside

- `fps-autoprotocol` for general transcript/protocol rules.
- `document-productivity-workflows` for DOCX/PDF and ERNE-CI verification.
- `knowledge-vault-workflows` for project archive/retrieval.

## Required project context files

Also consult `references/furkastrasse-fps-user-approved-rules.md` for the user-approved FPS 29 correction: strict Furkastrasse FPS structure, latest optimized DOCX reference, and the rule that transcript/video/protocol-basis references must not appear in client-facing FPS protocols.

Before generating any Furkastrasse FPS protocol, inspect:

```text
~/jarvis_memory/work/projects/furkastrasse/project.md
~/jarvis_memory/work/projects/furkastrasse/meetings/README.md
~/jarvis_memory/work/projects/furkastrasse/meetings/2026-06-10_fachplanersitzung_28_context/fps_structure_context.md
```

Use the archived PDF/text only when needed for details:

```text
~/jarvis_memory/work/projects/furkastrasse/meetings/2026-06-10_fachplanersitzung_28_context/artifacts/260610_hffi_Protokoll_28_Fachplanersitzung.pdf
~/jarvis_memory/work/projects/furkastrasse/meetings/2026-06-10_fachplanersitzung_28_context/artifacts/260610_hffi_Protokoll_28_Fachplanersitzung.txt
```

## Truth-source rule

For a new FPS, the new video/audio/provisional transcript is the truth source. The prior protocol is a **structure, role, continuity and pendenzen context**, not proof that the same facts still apply.

- Do not copy old pendenzen blindly.
- Continue old pendenzen only if the new transcript confirms, updates, or discusses them.
- If the new meeting contradicts the old protocol, record the current meeting and mark the earlier point as superseded/unclear.
- Never invent deadlines, owners, decisions, or status.

## Furkastrasse FPS standard structure

Use this established order unless the user explicitly instructs otherwise. This is mandatory for Furkastrasse because the project already has an established running FPS protocol series:

1. Genehmigung Protokoll
2. Infos von Bauherrn / BauKo-Sitzung
3. Stand der Planung / offene Sachfragen
   1. Architekt
   2. Holzbau
   3. Bauingenieur
   4. Haustechnik
   5. Elektroingenieur
4. Stand der Ausschreibungen
5. Termine
6. PQM, Q-Schwerpunkte Fachplaner
7. Pendenzen- und Beschlussliste
8. Infos an Bauherren / BauKo-Sitzung
9. Abwesenheit / Stv.
10. Nächste Sitzung

Do **not** use the generic management-summary / Ampelstatus / risks-and-chances format for Furkastrasse FPS unless the user explicitly asks for it. The body should follow the previous Furkastrasse protocol style: Teilnehmerseite, Traktandenliste, then a through-running protocol table with section rows and concrete sub-items, plus a separate pendenzen/beschluss list.

## Header / participants / protocol conventions

Use the prior Furkastrasse FPS convention. If the user provides an edited/optimized protocol, treat it as the latest formatting/wording reference for future Furkastrasse FPS documents.

Important external-protocol rule: **Do not mention the transcript, Teams transcript, MP4/video recording, audio recording, or AutoProtocol/source basis inside the final FPS protocol** unless the user explicitly asks for a source note. These can be kept in internal archive metadata, but not in the client-facing protocol. Do not list the transcript or video as protocol attachments/beilagen.

Latest user-approved Furkastrasse FPS formatting/wording reference:

```text
~/jarvis_memory/work/projects/furkastrasse/meetings/2026-07-01_fachplanersitzung_29/artifacts/260701_Furkastrasse_Protokoll_29_Fachplanersitzung_user_optimiert.docx
```

For future Furkastrasse FPS: use the MP4/audio/transcript only as internal truth source, generate the protocol in the established Furkastrasse table structure, then strip all source/protocol-basis references before delivery.

- Project line: `Projekt: 410.2725.10 - Schaffhausen - WÜB Furkastrasse`
- Protocol title: `Protokoll <Nr.> Fachplanersitzung`
- Date/time and place, usually Teams.
- Participants grouped as:
  - `Anwesend`
  - `Entschuldigt`
  - `Verteiler`
- Use Kürzel/name/company/email style if the output format supports it.
- Use legend: `I = Information, B = Beschluss, P = Pendenz`.
- Main protocol table columns should follow the prior format where practical:
  - `Nr`
  - `Traktandum`
  - `Verantwortlich`
  - `Termin`
  - type/status `I/B/P`
- Pendenzenliste should be separate and follow:
  - `Pos.`
  - `Datum`
  - `Pendenz`
  - `Verantwortlich`
  - `Termin`
  - `Erledigt`

## Known participant / Kürzel context from Protokoll 28

Use only for recognition and consistency; confirm against new meeting where possible.

### Anwesend in Protokoll 28

- `FRS` – Stefan Fritsche – ERNE AG Holzbau
- `HÄM` – Martin Hänz – Hänz AG
- `HOF` – Fiona Hoffbauer – ERNE AG Holzbau
- `PAD` – Dario Papalo – Studio Oesch Papalo
- `SAL` – Larissa Salis – WaltGalmarini AG Dipl. Ing. ETH SIA USIC
- `SCL` – Lars Schwager – R+B engineering ag
- `WEM` – Markus Wetter – EnGePlan AG Energie- und Gebäudetechnikplanung

### Entschuldigt in Protokoll 28

- `BÖO` – Olaf Böhme – ERNE AG Holzbau
- `WIS` – Stefan Wick – R+B engineering ag

### Verteiler in Protokoll 28

- `GAM` – Marcel Gasser – ERNE AG Holzbau
- `GRC` – Christian Gruber – Magma AG
- `LIM` – Marcel Limbach – Timbatec Holzbauingenieure (Schweiz) AG

## Continuity points from Protokoll 28

These are useful continuity checks for the next FPS, not automatic carry-over items:

- Architektur: Übersichtspläne in Ausführungsplanung überführen.
- Architektur: Türliste korrigieren und freigeben bis 12.06.2026.
- Bauingenieur: Zusätzliche Arbeitsfugen im Beton / Wände über Türen mit Arbeitsfuge im Sturz; gestalterische Freigabe mit Architektur klären.
- Bauingenieur: Offerte Statik Betonfertigteile erwartet; Statik für erste Treppen dringend.
- Haustechnik: Martin Hänz erstellt Durchbruchliste; Fertigstellung ca. in vier Wochen, danach Korrekturlauf.
- Ausschreibungen vergeben: Abbruch/Tiefbau/Werkleitung/Baumeister, Schutzraum, Gerüst, Elektro, Heizung, Sanitär, Fertignasszellen, Aussentüren, Aufzüge, Fenster, Lüftung, Innentüren, Küchen, Schlosser-/Metallbau, Metalltüren Traforaum/Nebenräume/Keller.
- Ausschreibungen ausstehend: Dacharbeiten, Betonfertigteile, Trockenbau, Estrich, Parkett/Fliesen, Maler, Tiefgaragentor, Umgebung.
- Termine: Terminplan vom 18.12.2025 war in Protokoll 28 gültig.
- Abwesenheiten: als Kontext prüfen, nicht automatisch übernehmen.

## Processing workflow for the next Furkastrasse FPS

1. Extract/read the new video/audio/provisional transcript.
2. Load Furkastrasse `project.md` and `fps_structure_context.md`.
3. If audio is present, transcribe with WhisperX/AutoProtocol; if provisional transcript is supplied, use it and only re-transcribe if needed for quality.
4. Create a cleaned transcript with time/speaker/technical statement traceability.
5. Reconcile current meeting against Protokoll 28:
   - mark continued pendenzen;
   - mark closed/resolved items only if explicitly stated;
   - add new discussed points;
   - do not preserve obsolete points as active.
6. Draft protocol in the Furkastrasse FPS structure above.
7. Produce user-facing DOCX and PDF.
8. Archive under:

```text
~/jarvis_memory/work/projects/furkastrasse/meetings/YYYY-MM-DD_fachplanersitzung_<nr>/meeting.md
~/jarvis_memory/work/projects/furkastrasse/meetings/YYYY-MM-DD_fachplanersitzung_<nr>/artifacts/
```

9. Update:

```text
~/jarvis_memory/work/projects/furkastrasse/meetings/README.md
~/jarvis_memory/work/projects/furkastrasse/project.md
```

## ERNE CI/layout expectations

- Prefer the established Furkastrasse/FPS protocol look over generic management-summary format.
- Keep ERNE header/footer if a template is available.
- Do not overload pages: keep sufficient header/footer clearance.
- Tables must be readable and not clipped.
- Generate PDF from final DOCX and verify via `pdfinfo`, `pdftotext`, and rendered-page visual QA.

## Output style

Final protocol should be concise and formal, Swiss Hochdeutsch, no emojis inside the document. The chat status to the user may be concise with ✅/🧪 as usual.